UPS Bootup sequence using NUT

I was setting up a TrippLite UPS more specifically the SMART1000RMXL2U model and the way I have it set up is I have a network switch plugged into one load and the PC plugged into another load on this UPS model. Is there any way I can configure the UPS using NUT to have the load containing the PC to delay its boot up by 10 minutes for example to allow the other load to turn on before it? I tried using a clone driver on the loads but am having no success

@accnrox Hello again.
This appears to be a duplicate of your following forum thread:
Using Network UPS Tools to control when loads connected to the UPS come on

Linking so folks can contribute there.

Hope that helps.

2 Likes